Step 3 Open the AC maintenance compartment door, install a support bar, and use a
multimeter to check the voltage between the AC terminal block and the ground.
Ensure that the AC side of the Smart PCS is powered off.
Step 4 Turn off DC switch 1Q2 in the ESS.
Step 5 Open the DC maintenance compartment door, install a support bar, and use a
multimeter to check the voltage between DC terminal blocks. Ensure that the DC
side of the Smart PCS is powered off.
----End
Powering Off the ESS
Step 1 Turn off all switches in the power distribution system of the ESS.
1.
2.
3.
4.
Step 2 Turn off the AC main switch 1FCB.
Step 3 (Optional) Turn off the UPS cable inlet switch 5FCB.
Step 4 Turn off the DC switch 1Q1.
----End
2.2.4 Powering Off the Power Supply Loop of the AC Power
Distribution Cabinet
Step 1 Turn off the switches between the AC power distribution cabinet and the ESS.
----End

2.3 Routine Maintenance

2.3.1 Unscheduled Maintenance

Log in to the SmartLogger WebUI/CMU WebUI/FusionSolar app/SmartPVMS and
check whether there are major or minor alarms.
Issue 02 (2023-02-28)
On the embedded power subrack (SK1), turn off the DC/DC switch 2FCB1, DC
light power switch 2FCB2, TCUE switch 2FCB3, fan 1 switch 2FCB6, fan 2
switch 2FCB7, air conditioner 1 switch 2FCB8, and air conditioner 2 switch
2FCB9 in sequence.
(Optional) Turn off the 220 V maintenance socket switch 1FB1.
Turn off the PSU switch 1FCB2.
Turn off the 12 V adapter switch 1FCB1.
NO TE
For details, see the software user manuals.
Copyright © Huawei Digital Power Technologies Co., Ltd.
2 Routine Maintenance
24

Advertisement

Table of Contents
loading

This manual is also suitable for:

Luna2000-200kwh-100kw-2h1

Table of Contents