DLP-G28 Install the Fiber Patch-Panel Tray

Tools/Equipment
Prerequisite
Procedures
Required/As Needed
Onsite/Remote
Security Level
Procedure
Step 1
The DCU chassis requires 1 RU in a standard 19-inch (482.6-mm) or 23-inch (584.2-mm) rack. Locate the
RMU space specified in your site plan.
Step 2
Two sets of mounting brackets are included with the DCU mounting kit, one set each for 19-inch (482.6-mm)
or 23-inch (584.2-mm) racks. Verify that your chassis is equipped with the correct set of brackets for your
rack. Change the brackets as required.
Step 3
Align the chassis with the rack mounting screw holes; one at a time, insert and tighten the four screws.
Step 4
Connect a frame ground to the ground terminal provided on either side of the chassis. Use minimum #14
AWG wire.
Step 5
Return to your originating procedure (NTP).
DLP-G28 Install the Fiber Patch-Panel Tray
Purpose
Tools/Equipment
Prerequisite Procedures
Required/As Needed
Onsite/Remote
Security Level
Cisco ONS 15454 Hardware Installation Guide
124
#2 Phillips Dynamometric screwdriver
Crimping tool
#14 AWG wire and lug
None
As needed
Onsite
None
This task installs the fiber patch-panel tray. Install the appropriate L-band or
C-band patch-panel tray as necessary. The sticker on the front of the tray indicates
for which band the tray is used.
#2 Phillips Dynamometric screwdriver
Crimping tool
#14 AWG wire and lug
None
As needed
Onsite
None