Dlp-G600 Turn On And Verify Dc Office Power On The Ons 15454 M2 Shelf - Cisco ONS 15454 Hardware Installation Manual

Hide thumbs Also See for ONS 15454:
Table of Contents

Advertisement

DLP-G600 Turn On and Verify DC Office Power on the ONS 15454 M2 Shelf

Prerequisite Procedures
Required/As Needed
Onsite/Remote
Security Level
Caution
Do not apply power to the shelf until you complete all the installation steps.
Warning
To ensure safety of personnel and equipment, do not connect any power cables into the power module
until the module is completely installed into the chassis. Statement 389
Warning
To reduce the risk of electric shock, switch on the power only after the power cord is completely installed
into the power module. Statement 390
Procedure
Step 1
To power up the node, insert the fuse into the fuse position according to site practice. The fuse rating must
not exceed 15A in case of AC power.
Step 2
If the ONS 15454 M2 does not power up, check the voltage at the power source using a voltmeter. The voltage
should be 100 to 240 VAC +/-10 percent.
Step 3
Return to your originating procedure (NTP).
DLP-G600 Turn On and Verify DC Office Power on the ONS 15454 M2 Shelf
Purpose
Tools/Equipment
Cisco ONS 15454 Hardware Installation Guide
252
NTP-G266 Install the ONS 15454 M2 Shelf, on page
• Connect the office ground to chassis. For detailed instructions on grounding,
refer to the
Electrostatic Discharge and Grounding Guide for Cisco CPT and
Cisco ONS Platforms
.
NTP-G270 Open and Remove the Standard Door of the ONS 15454 M2
Shelf, on page
218.
NTP-G267 Install the Power Module in the ONS 15454 M2 Shelf, on page
230.
DLP-G596 Connect Office Power (AC) to the ONS 15454 M2 Shelf, on
page 241
Required
Onsite
None
This task measures the power to verify correct power and returns for the ONS
15454 M2 shelf.
Voltmeter
Installing the ONS 15454 M2 Shelf
194.

Advertisement

Table of Contents
loading

Table of Contents