Preparing to Install the ONS 15454 (ANSI and ETSI), ONS 15454 M2 and ONS 15454 M6 Shelf
Tools/Equipment
Prerequisite Procedures
Required/As Needed
Onsite/Remote
Security Level
Procedure
Step 1
When you receive the ONS 15454, ONS 15454 M2, or ONS 15454 M6 system equipment at the installation
site, open the top of the box. The Cisco Systems logo designates the top of the box.
Step 2
Remove the foam inserts from the box. The box contains the ONS 15454 shelf (wrapped in plastic) and a
smaller box of items needed for installation.
Step 3
To remove the shelf, grasp both rings of the shelf removal strap and slowly lift the shelf out of the box.
Step 4
Open the smaller box of installation materials, and verify that you have all items listed in the
and Equipment, on page
Note
Step 5
Return to your originating procedure (NTP).

DLP-G677 Inspect the ONS 15454, ONS 15454 M2, and ONS 15454 M6 Shelves

Purpose
Tools/Equipment
Prerequisite Procedures
Required/As Needed
Onsite/Remote
Security Level
Procedure
Step 1
Open the shelf using the pinned hex key. For more information, see the
Compartment (Door) , on page
Step 2
Verify the following:
• The pins are not bent or broken.
None
None
Required
Onsite
None
9.
If the shelf and ancillary units are ordered separately, then the power modules, LCD module, ECU
or ECU2 module, fan-tray assembly, and mounting brackets are shipped separately.
This task verifies that all parts of the shelf are in good condition.
Pinned hex (Allen) key for front door
DLP-G676 Unpack and Verify the ONS 15454, ONS 15454 M2, and ONS 15454
M6 Shelves , on page 20
Required
Onsite
None
57.
DLP-G677 Inspect the ONS 15454, ONS 15454 M2, and ONS 15454 M6 Shelves
Cisco ONS 15454 Hardware Installation Guide
Required Tools
DLP-G9 Open the Front Cabinet
21

Advertisement

Table of Contents
loading

Table of Contents