Dlp-G28 Install The Fiber Patch-Panel Tray" Task; Dlp-G29 Install The Fiber-Storage Tray" Task - Cisco ONS 15454 ETSI Manual

Table of Contents

Advertisement

Chapter 1 Install the Shelf and Common Control Cards
DLP-G28 Install the Fiber Patch-Panel Tray
Purpose
Tools/Equipment
Prerequisite Procedures None
Required/As Needed
Onsite/Remote
Security Level
The fiber patch-panel tray requires 1 to 2 RUs of space in a standard 19-inch (482.6-mm) or 23-inch
Step 1
(584.2-mm) rack, depending on whether you are installing a standard or deep patch-panel tray. (The
standard tray requires 1 RU, and the deep 32-channel, 40-channel, and mesh patch panel trays each
require 2 RUs.) Locate the RMU space specified in your site plan. Refer to the "Shelf Assembly
Hardware" chapter in the Cisco ONS 15454 DWDM Reference Manual for common site configurations.
Verify that the mounting brackets attached to the unit are correct for your rack size. Complete
Step 2
Reverse the Mounting Bracket to Fit a 19-inch (482.6-mm) Rack (ANSI Only)" task on page 1-10
required.
Align the tray chassis with the rack mounting screw holes, then insert and tighten the four screws.
Step 3
Connect a frame ground to the ground terminal provided on either side of the chassis. Use minimum #14
Step 4
AWG wire.
Repeat Steps
Step 5
Return to your originating procedure (NTP).
Step 6
DLP-G29 Install the Fiber-Storage Tray
Purpose
Tools/Equipment
Prerequisite Procedures None
Required/As Needed
Onsite/Remote
Security Level
The fiber-storage tray requires 1 RU in a standard 19-inch (482.6-mm) or 23-inch (584.2-mm) rack.
Step 1
Locate the RMU space specified in your site plan. Refer to the "Shelf Assembly Hardware" chapter in
the Cisco ONS 15454 DWDM Reference Manual for common site configurations.
78-17704-02
This task installs the fiber patch-panel tray. Install the appropriate L-band
or C-band patch-panel tray as necessary. The sticker on the front of the tray
indicates for which band the tray is used.
#2 Phillips Dynamometric screwdriver
Crimping tool
#14 AWG wire and lug
As needed
Onsite
None
2
through
4
for each patch-panel tray you want to install.
This task installs the fiber-storage tray. The fiber-storage tray stores slack
fiber-optic cable.
#2 Phillips Dynamometric screwdriver
As needed
Onsite
None
NTP- G28 Install the Fiber Patch-Panel Tray
Cisco ONS 15454 DWDM Procedure Guide, R8.0
"DLP-G3
as
1-69

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ons 15454 ansi

Table of Contents