Mounting Multiple Nodes - Cisco ONS 15454 Hardware Installation Manual

Hide thumbs Also See for ONS 15454:
Table of Contents

Advertisement

Installing the ONS 15454 M12 (ANSI and ETSI) Shelf

Mounting Multiple Nodes

Figure 10: Mounting an ONS 15454 ETSI Shelf in a Rack
Two people should install the shelf; however, one person can install it using the temporary set screws included.
The shelf should be empty for easier lifting. The front door can also be removed to lighten the shelf.
Mounting Multiple Nodes
Most standard (Telcordia GR-63-CORE, 23-inch [584.2 mm]) seven-foot (2,133 mm) racks can hold three
ONS 15454 ETSI shelves, two air ramps, and a fuse and alarm panel. The following figure shows a three-shelf
ONS 15454 ETSI bay assembly.
Cisco ONS 15454 Hardware Installation Guide