Dlp-G292 Install Timing Wires In Ons 15454 M2 - Ansi - Cisco ONS 15454 Hardware Installation Manual

Hide thumbs Also See for ONS 15454:
Table of Contents

Advertisement

Installing the ONS 15454 M2 Shelf
Procedure
Step 1
Complete either
Timing Wires in ONS 15454 M2 - ETSI, on page 257
Step 2
Complete
You must connect a CAT-5 Ethernet cable to the LAN port on the TNC/TNCE/TSC/TSCE/TNCS-2/TNCS-2O
card to create an external LAN connection.
Stop. You have completed this procedure.

DLP-G292 Install Timing Wires in ONS 15454 M2 - ANSI

Purpose
Tools/Equipment
Prerequisite Procedures
Required/As Needed
Onsite/Remote
Security Level
Procedure
Step 1
Locate the timing BITS connectors in the DC-2 or AC-2 Power Module, as shown in the following two figures.
DLP-G292 Install Timing Wires in ONS 15454 M2 - ANSI, on page 255
DLP-G294 Install LAN Wires in ONS 15454 M2, on page 261
This task installs the timing wires in the DC-2 or AC-2 Power Module of ONS
15454 M2 (ANSI).
100-ohm wire wrap cable, wire wrap tool
None
As needed
Onsite
None
DLP-G292 Install Timing Wires in ONS 15454 M2 - ANSI
if you are provisioning external timing.
to create an external LAN connection.
Cisco ONS 15454 Hardware Installation Guide
or
DLP-G293 Install
255

Advertisement

Table of Contents
loading

Table of Contents