Omron C200HX Operation Manual page 320

Hide thumbs Also See for C200HX:
Table of Contents

Advertisement

Step Instructions
Example 3:
Parallel Execution
SW1
Process C
SW2
302
The following process requires that two parts of a product pass simultaneously
through two processes each before they are joined together in a fifth process.
Various sensors are positioned to signal when processes are to start and end.
SW3
Process A
Process B
Process D
SW4
The following diagram demonstrates the flow of processing and the switches
that are used for execution control. Here, process A and process C are started
together. When process A finishes, process B starts; when process C finishes,
process D starts. When both processes B and D have finished, process E starts.
Process A
Process B
Process E
End
The program for this operation, shown below, starts with two SNXT(09) instruc-
tions that start processes A and C. These instructions branch from the same
instruction line and are always executed together, starting steps for both A and
C. When the steps for both A and C have finished, the steps for process B and D
begin immediately.
When both process B and process D have finished (i.e., when the status for both
of them is "ON," but SW5 and SW6 have turned ON), processes B and D are
reset together by the SNXT(09) at the end of the programming for process B.
Although there is no SNXT(09) at the end of process D, the control bit for it is
turned OFF by executing SNXT(09) LR 0004. This is because the OUT for LR
0003 is in the step reset by SNXT(09) LR 0004, i.e., LR 003 is turned OFF when
SNXT(09) LR 0004 is executed Process B is thus reset directly and process D is
reset indirectly before executing the step for process E.
SW5
Process E
SW6
SW 1 and SW2 both ON
Process C
SW3
Process D
SW5 and SW6 both ON
SW7
Section 5-24
SW7
SW4

Advertisement

Table of Contents
loading

This manual is also suitable for:

C200hgC200he

Table of Contents