RELATED DOCUMENTATION
Overview of Preparing the Site for the MX2020 Router | 121
Tools Required to Install the MX2020 Router Using a Pallet Jack | 223
Installing the MX2020 Router Using a Pallet Jack with Attachment | 260
Installing the MX2020 Router Using a Pallet Jack with Attachment
Before installing the router, you must remove all components (see
MX2020 Router Chassis Before Installing it in a Rack" on page
with attachment:
1. Ensure that the rack or cabinet is in its permanent location and is secured to the building. Ensure that
the installation site allows adequate clearance for both airflow and maintenance.
2. Reinstall the front and rear shipping covers to help guide the chassis during installation.
3. Place the pallet jack attachment across both legs and secure the attachment to the pallet jack.
4. Using a four-person team to load the router onto the pallet jack, make sure it rests securely on the
pallet jack attachment platform.
"Removing Components from the
245). To install the router using a pallet jack
260