Mx2020 Site Preparation Checklist - Juniper MX2020 Hardware Manual

Universal routing platform
Hide thumbs Also See for MX2020:
Table of Contents

Advertisement

Review the maximum distance allowed for each cable. Choose the length of cable based on the
distance between the hardware components being connected. See:
Calculating Power Budget and Power Margin for Fiber-Optic Cables on page 149
Understanding Fiber-Optic Cable Signal Loss, Attenuation, and Dispersion on page 151
10. Plan the cable routing and management. See:
MX2020 Cable Management Description on page 37
Maintaining Cables That Connect to MX2020 MPCs or MICs on page 529
RELATED DOCUMENTATION
MX2020 Universal Edge Router Overview | 3

MX2020 Site Preparation Checklist

The checklist in
Table 35 on page 123
router installation.
Table 35: MX2020 Site Preparation Checklist
Item or Task
Environment
Verify that environmental
factors such as temperature
and humidity do not exceed
router tolerances.
Power
Measure distance between
external power sources and
router installation site.
summarizes the tasks you must perform when preparing a site for
For More Information
"MX2020 Router Environmental
Specifications" on page 137
"MX2020 DC Power
Distribution Module (-48 V)
Description" on page 107
"MX2000 DC Power
Distribution Module (240 V
China) Description" on page 109
Performed By
Date
123

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents