Table 35: MX2020 Site Preparation Checklist (continued)
Item or Task
Locate sites for connection of
system grounding.
Calculate the power
consumption and
requirements.
Rack
Verify that your rack meets
the minimum requirements for
the installation of the router.
NOTE:
There must be a
minimum of 45U of usable
rack space when installing the
MX2020 router into a 45U
rack.
Plan rack or cabinet location,
including required space
clearances.
NOTE:
If you are installing the
MX2020 router into a network
cabinet, make sure that no
hardware, device, rack, or
cabinet component obstructs
the 45U rack space from
access during installation.
If a rack is used, secure rack to
floor and building structure.
Cables and Transceivers
For More Information
"MX2000 Router Grounding
Specifications" on page 138
"MX2020 AC Power
Requirements" on page 167
"MX2020 DC Power
Requirements" on page 193
"MX2020 Rack Requirements"
on page 130
"MX2020 Cabinet Size and
Clearance Requirements" on
page 133
"MX2020 Cabinet Size and
Clearance Requirements" on
page
133,
"MX2020 Rack Requirements"
on page
130,
"Clearance Requirements for
Airflow and Hardware
Maintenance for the MX2020
Router" on page 133
"MX2020 Rack Requirements"
on page 130
Performed By
Date