Juniper MX2020 Hardware Manual page 352

Universal routing platform
Hide thumbs Also See for MX2020:
Table of Contents

Advertisement

NOTE:
After a PSM and a PDM are powered on, it can take up to 60 seconds for status
indicators—such as the output status LEDs on the PSM, and the command output on the
craft interface—to indicate that the PSM and PDM are functioning normally. Ignore error
indicators that appear during the first 60 seconds.
10. Verify that the PWR OK LED on the AC PSM faceplate is lit steadily, indicating that PDM is correctly
installed, functioning properly, and providing power to the AC outputs.
11. On the external management device connected to the Routing Engine, monitor the startup process to
verify that the system has booted properly.
12. Verify that the router powers up and goes through the system initialization process.
RELATED DOCUMENTATION
Initially Configuring the MX2010 Router
Maintaining and Verifying the Status of the MX2010 Router Components
Initially Configuring the MX2020 Router | 347
Maintaining and Verifying the Status of the MX2020 Router Components | 667
MX2000 Three-Phase Delta AC Power Distribution Module Description | 96
MX2000 Three-Phase Wye AC Power Distribution Module Description | 98
Connecting the MX2000 Series Router to a Console or Auxiliary Device
Connecting AC Power to an MX2000 Router with Three-Phase Delta AC Power Distribution
Modules | 295
Mapping Input Power from AC Power Distribution Modules to AC Power Supply Modules on MX2000
Routers | 190
Preventing Electrostatic Discharge Damage to an MX2010 Router
Preventing Electrostatic Discharge Damage to an MX2020 Router
332

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents