Juniper MX2020 Hardware Manual page 312

Universal routing platform
Hide thumbs Also See for MX2020:
Table of Contents

Advertisement

6. Place the grounding cable lug over one of the grounding points on the rear of the chassis. The upper
pair is sized for UNC 1/4-20 nuts, and the lower pair is sized for M6 nuts.
7. Secure the grounding cable lug to the grounding points, first with the washers, and then with the nuts.
8. Verify that the grounding cabling is correct, that the grounding cable does not touch or block access
to router components, and that it does not drape where people could trip on it.
Figure 125: Connecting the Grounding Cable
RELATED DOCUMENTATION
MX2000 Router Grounding Specifications | 138
Prevention of Electrostatic Discharge Damage | 770
292

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents