NOTE:
After a PDM is powered on, it can take up to 60 seconds for status indicators—such
as the LEDs on the PDM, the command output displays, and messages on the LED display
on the craft interface—to indicate that the PDM is functioning normally. Ignore error
indicators that appear during the first 60 seconds.
SEE ALSO
Removing an MX2020 Three-Phase Wye AC Power Cord | 641
RELATED DOCUMENTATION
Preventing Electrostatic Discharge Damage to an MX2020 Router
MX2020 Three-Phase Wye AC Power Distribution Module Description
MX2020 Three-Phase Delta and Wye AC Power Distribution Module LEDs
MX2020 AC Power Cord Specifications
Troubleshooting the MX2000 Router Power System | 686
Replacing an MX2020 DC Power Distribution Module Cable
Disconnecting an MX2020 DC Power Distribution Module Cable | 649
1.
Connecting an MX2000 DC Router Power Distribution Module (-48 V) Cable | 650
2.
648