Installing An Mx2010 Cb-Re - Juniper MX2020 Hardware Manual

Universal routing platform
Hide thumbs Also See for MX2020:
Table of Contents

Advertisement

1.2 V
1.8 V
2.5 V
3.3 V
5.0 V
5.0 V RE
12.0 V
12.0 V RE
Bus Revision
FPGA Revision
CB 1 status:
State
IntakeA-Zone0 Temperature
IntakeB-Zone1 Temperature
IntakeC-Zone0 Temperature
ExhaustA-Zone0 Temperature 33 degrees C / 91 degrees F
ExhaustB-Zone1 Temperature 28 degrees C / 82 degrees F
TCBC-Zone0 Temperature
Power 1
1.0 V
1.2 V
1.8 V
2.5 V
3.3 V
5.0 V
5.0 V RE
12.0 V
12.0 V RE
Bus Revision
FPGA Revision
SEE ALSO

Installing an MX2010 CB-RE

To install a CB-RE
(seeFigure 229 on page
1. Attach an electrostatic discharge (ESD) grounding strap to your bare wrist, and connect the strap to
one of the ESD points on the chassis.
2. Remove the CB-RE from the electrostatic bag.
1208 mV
1801 mV
2526 mV
3312 mV
5020 mV
4995 mV
12123 mV
12007 mV
100
271
Online Standby
30 degrees C / 86 degrees F
25 degrees C / 77 degrees F
39 degrees C / 102 degrees F
31 degrees C / 87 degrees F
1015 mV
1211 mV
1814 mV
2545 mV
3345 mV
5066 mV
5020 mV
12104 mV
12046 mV
100
0
507):
505

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents