Juniper MX2020 Hardware Manual page 436

Universal routing platform
Hide thumbs Also See for MX2020:
Table of Contents

Advertisement

NOTE:
After powering on a PSM, wait at least 60 seconds before turning it back off.
To install an AC PSM (see
1. With one PSM installed and operational, install an additional PSM with the power supply switch in the
off (O), or in the on (|) position.
WARNING:
switch must be placed in the off (O) position.
2. Attach an electrostatic discharge (ESD) grounding strap to your bare wrist, and connect the strap to
one of the ESD points on the chassis.
3. While grasping the handle on the PSM faceplate with one hand, use your other hand to guide the power
supply module into the chassis.
4. Tighten the captive screws on the PSM faceplate.
5. Turn on the power switch to the on (|) position.
6. Verify that the PWR OK LED is lit steadily green.
Figure 205 on page 417,Figure 206 on page
If there is only one PSM installed and operational, the power supply
417, or
Figure 137 on page
416
312:

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents