Removing The Screw-In Raid Controller Card - Huawei FusionServer Pro CH121 V5 V100R005 Maintenance And Service Manual

Compute node
Hide thumbs Also See for FusionServer Pro CH121 V5 V100R005:
Table of Contents

Advertisement

FusionServer Pro CH121 V5 Compute Node
Maintenance and Service Guide
Step 3 Take the spare part out of its ESD bag.
Step 4 Install the M.2 FRU.
Install filler panels in vacant slots to ensure optimal shielding for EMC.
1.
2.
Figure 4-4 Installing an M.2 FRU
Step 5 Check the indicator status of the M.2 FRU.
For details, see
----End

4.3.3 Removing the Screw-in RAID Controller Card

Procedure
Step 1 Power off the compute node.
For details, see
Step 2 Remove the compute node.
For details, see
Step 3 Place the compute node on the ESD workstation.
Step 4 Remove the cover.
For details, see
Issue 06 (2019-08-10)
NOTE
Perform this operation only when a filler panel is installed.
Holding the handle of the M.2 FRU, push the M.2 FRU in the M.2 adapter slot. See (1)
in
Figure
4-4.
Close the M.2 FRU handle. See (2) in
M.2 FRU
3.1 Power-Off
3.3 Removing a CH121
3.5 Removing the
Copyright © Huawei Technologies Co., Ltd.
Figure
Indicators.
Procedure.
V5.
Cover.
4-4.
4 Parts Replacement
56