Installing The Supercapacitor - Huawei FusionServer Pro CH121 V5 V100R005 Maintenance And Service Manual

Compute node
Hide thumbs Also See for FusionServer Pro CH121 V5 V100R005:
Table of Contents

Advertisement

FusionServer Pro CH121 V5 Compute Node
Maintenance and Service Guide
Figure 4-13 Removing the supercapacitor holder
Step 9 Tighten the screws shown by (1) to secure the RAID controller card.
----End

4.3.10 Installing the Supercapacitor

Procedure
Step 1 Power off the compute node.
For details, see
Step 2 Remove the compute node.
For details, see
Step 3 Place the compute node on the ESD workstation.
Step 4 Remove the cover.
For details, see
Step 5 Take the spare part out of its ESD bag.
Step 6 Determine the position of the supercapacitor.
Issue 06 (2019-08-10)
3.1 Power-Off
Procedure.
3.3 Removing a CH121
3.5 Removing the
Cover.
Copyright © Huawei Technologies Co., Ltd.
V5.
4 Parts Replacement
65

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents