4.3.12 Installing a Mezzanine Card

Procedure
Step 1 Power off the compute node.
For details, see
Step 2 Remove the compute node.
For details, see
Step 3 Place the compute node on the ESD workstation.
Step 4 Remove the cover.
For details, see
Step 5 Take the spare part out of its ESD bag.
Step 6 Determine the position of the mezzanine card.
Issue 06 (2019-08-10)
Figure 4-18 Removing mezzanine cards
Place the removed mezzanine card in an ESD bag.
3.1 Power-Off
3.3 Removing a CH121
3.5 Removing the
Copyright © Huawei Technologies Co., Ltd.
Procedure.
V5.
Cover.
4 Parts Replacement
70

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents