Huawei FusionServer Pro CH121 V5 V100R005 Maintenance And Service Manual page 87

Compute node
Hide thumbs Also See for FusionServer Pro CH121 V5 V100R005:
Table of Contents

Advertisement

FusionServer Pro CH121 V5 Compute Node
Maintenance and Service Guide
Step 3 Place the compute node on the ESD workstation.
Step 4 Remove the cover.
For details, see
Step 5 Remove the air duct.
For details, see
Step 6 Check whether a PCIe card is installed.
l
l
Step 7 Remove the PCIe card.
For details, see
Step 8 Take the spare part out of its ESD bag.
Step 9 Determine the position of the processor.
Figure 4-28 Positions of processors
Step 10 Install the processor on the carrier.
1.
2.
Issue 06 (2019-08-10)
3.5 Removing the
3.7 Removing the Air
If yes, go to
Step
7.
If no, go to
Step
8.
3.11 Removing a PCIe
Take a processor carrier out of an ESD bag.
Aligning the notch in one edge of the processor with the protrusion on the processor
carrier, secure it.
Ensure that the processor corner with a triangle mark is in the corner of the processor
carrier with a notched triangle.
Copyright © Huawei Technologies Co., Ltd.
Cover.
Ducts.
Card.
4 Parts Replacement
79

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents