Step 4 Install the battery.
For details, see
Step 5 Install mezzanine cards.
For details, see
Step 6 Install processors.
For details, see
Step 7 Install memory modules.
For details, see
Step 8 Install the TPM.
For details, see
Step 9 Install the USB flash drive.
For details, see
Step 10 Install the screw-in RAID controller card.
For details, see
Step 11 Install the supercapacitor if it is configured.
For details, see
Step 12 If PCIe cards are configured, install them.
For details, see
Step 13 Install the air duct.
For details, see
Step 14 Install the cover.
For details, see
Step 15 Install drives or M.2 modules.
l
l
l
Step 16 Install the compute node.
For details, see
Step 17 Power on the compute node.
Issue 06 (2019-08-10)
NOTE
The mainboard and the compute node case are assembled together and replaced as a whole package.
4.3.22 Installing the
4.3.12 Installing a Mezzanine
4.3.14 Installing a
4.3.16 Installing a Memory
4.3.18 Installing the
4.3.20 Installing a USB Flash
4.3.4 Installing the Screw-in RAID Controller
4.3.10 Installing the
3.12 Installing a PCIe
3.8 Installing the Air
3.6 Installing the
Install SAS/SATA drives.
For details, see
3.14 Installing a SAS/SATA
Install M.2 modules.
For details, see
4.3.2 Installing an M.2
Install NVMe drives.
For details, see
3.16 Installing an NVMe Drive
3.4 Installing a CH121
Copyright © Huawei Technologies Co., Ltd.
Battery.
Card.
Processor.
Module.
TPM.
Drive.
Supercapacitor.
Card.
Duct.
Cover.
Drive.
FRU.
.
V5.
4 Parts Replacement
Card.
104