FusionServer Pro CH121 V5 Compute Node
Maintenance and Service Guide
Step 16 Remove memory modules.
For details, see
Step 17 Remove processors.
For details, see
Step 18 Remove the mezzanine cards.
For details, see
Step 19 Remove the battery.
For details, see
Step 20 Place the removed compute node case and components in different ESD bags.
----End
4.3.24 Installing the Mainboard and Compute Node Case
Procedure
Step 1 Take the spare part out of its ESD bag.
Step 2 Place the compute node on the ESD workstation.
Step 3 Determine the position of the mainboard and the compute node case.
Figure 4-61 Mainboard and compute node case
Issue 06 (2019-08-10)
4.3.15 Removing a Memory
4.3.13 Removing a
4.3.11 Removing a Mezzanine
4.3.21 Removing the
NOTE
Before placing the mainboard and the compute node case into an ESD bag, ensure that the processor
sockets are installed with covers.
Copyright © Huawei Technologies Co., Ltd.
Module.
Processor.
Card.
Battery.
4 Parts Replacement
103