Huawei FusionServer Pro CH121 V5 V100R005 Maintenance And Service Manual page 160

Compute node
Hide thumbs Also See for FusionServer Pro CH121 V5 V100R005:
Table of Contents

Advertisement

FusionServer Pro CH121 V5 Compute Node
Maintenance and Service Guide
l
Issue 06 (2019-08-10)
Connect the network port of the local PC to the MGMT or STACK port of the active
MM910.
– If the MGMT port of the active MM910 is available, use this port.
Figure 12-3 Directly connecting to the Mgmt port on the active MM910 in slot
MM2 (example)
– If the MGMT port of the active MM910 is unavailable, connect the local PC to the
STACK port of the active MM910. If the STACK port is used to stack the MGMT
port in another chassis, connect the local PC to an idle STACK port on an active
MM910 in a chassis cascaded with the E9000 chassis.
If the MGMT port on the active MM910 is already connected with a network cable,
do not remove the network cable from the MGMT port. Otherwise, an active/
standby switchover of the MM910s will be triggered, which may cause network
interruption.
Copyright © Huawei Technologies Co., Ltd.
12 Common Operations
152

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents