Removing A Mezzanine Card - Huawei FusionServer Pro CH121 V5 V100R005 Maintenance And Service Manual

Compute node
Hide thumbs Also See for FusionServer Pro CH121 V5 V100R005:
Table of Contents

Advertisement

FusionServer Pro CH121 V5 Compute Node
Maintenance and Service Guide
Figure 4-16 Installing the supercapacitor
Step 9 Install the cover.
For details, see
Step 10 Install the compute node.
For details, see
Step 11 Power on the compute node.
For details, see
----End

4.3.11 Removing a Mezzanine Card

Procedure
Step 1 Record the mezzanine card configuration.
l
l
Issue 06 (2019-08-10)
3.6 Installing the
3.4 Installing a CH121
3.2 Power-On
NOTE
l When replacing an MZ220, MZ312, MZ520, MZ522, or MZ912 with a new one of the same model:
You do not need to record the mezzanine card configuration if stateless computing is enabled.
Record all the following configurations if stateless computing is not enabled.
l When replacing a mezzanine card with another model, record all the following configurations.
BIOS configuration
For details, see the
user guide
OS configuration, including IP addresses, VLAN IDs, and NIC bonding configuration
– The method used to query the IP address varies depending on the operating system:
If Windows is used, query the IP address in the NIC property window.
n
If VMware ESXi is used, press Alt+F2 on the login page and query the IP
n
address.
If Linux is used, run the ifconfig -a command on the CLI.
n
– To query the VLAN ID:
Refer to the
user guide
– To query the NIC bonding configuration:
Refer to the
user guide
Copyright © Huawei Technologies Co., Ltd.
Cover.
V5.
Procedure.
of the mezzanine card you use.
of the mezzanine card you use.
of the mezzanine card you use.
4 Parts Replacement
67

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents