Installing The Air Duct - Huawei FusionServer Pro CH121 V5 V100R005 Maintenance And Service Manual

Compute node
Hide thumbs Also See for FusionServer Pro CH121 V5 V100R005:
Table of Contents

Advertisement

FusionServer Pro CH121 V5 Compute Node
Maintenance and Service Guide
Step 6 Lift the left and right air ducts.
Figure 3-12 Removing the air ducts
Step 7 Place the removed component in an ESD bag.
----End

3.8 Installing the Air Duct

Procedure
Step 1 Power off the compute node.
For details, see
Step 2 Remove the compute node.
For details, see
Step 3 Place the compute node on the ESD workstation.
Step 4 Remove the cover.
For details, see
Step 5 Take the spare part out of its ESD bag.
Step 6 Determine the position of the air duct.
Step 7 Check whether a PCIe card is installed.
l
l
Step 8 Transform the air duct.
Issue 06 (2019-08-10)
3.1 Power-Off
3.3 Removing a CH121
3.5 Removing the
If yes, go to
Step
8.
If no, go to
Step
9.
Copyright © Huawei Technologies Co., Ltd.
Procedure.
V5.
Cover.
3 Basic Operations
19

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents