Huawei FusionServer Pro CH121 V5 V100R005 Maintenance And Service Manual page 97

Compute node
Hide thumbs Also See for FusionServer Pro CH121 V5 V100R005:
Table of Contents

Advertisement

FusionServer Pro CH121 V5 Compute Node
Maintenance and Service Guide
Step 11 Check whether a PCIe card is installed.
l
l
Step 12 Install the PCIe card.
For details, see
Step 13 Install the air duct.
For details, see
Step 14 Install the cover.
For details, see
Step 15 Install the compute node.
For details, see
Step 16 Power on the compute node.
For details, see
Step 17 Check whether the memory module is replaced successfully.
1.
2.
----End
Issue 06 (2019-08-10)
Figure 4-43 Installing a memory module
If yes, go to
Step
12.
If no, go to
Step
13.
3.12 Installing a PCIe
3.8 Installing the Air
3.6 Installing the
3.4 Installing a CH121
3.2 Power-On
Log in to the iBMC WebUI.
For details, see
12.2 Logging In to the iBMC
Choose Information > System Info > Memory, and check the memory information.
– If information about the new memory module is displayed, the replacement is
successful.
– If information about the original memory module is displayed, access the BIOS and
check memory information.
For details, see
Huawei Server Purley Platform BIOS Parameter
Copyright © Huawei Technologies Co., Ltd.
Card.
Duct.
Cover.
V5.
Procedure.
WebUI.
4 Parts Replacement
Reference.
89

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents