Huawei FusionServer Pro CH121 V5 V100R005 Maintenance And Service Manual page 20

Compute node
Hide thumbs Also See for FusionServer Pro CH121 V5 V100R005:
Table of Contents

Advertisement

FusionServer Pro CH121 V5 Compute Node
Maintenance and Service Guide
Figure 3-4 Removing a compute node
Step 4 Place the removed compute node in an ESD bag.
Place only one compute node in an ESD bag.
Step 5 Install filler panels.
Install filler panels in vacant slots. Otherwise, the ventilation, heat dissipation,
electromagnetic shielding, and dustproof effects of the chassis will be affected.
Insert the filler panel into the chassis horizontally until it clicks into place.
Issue 06 (2019-08-10)