FusionServer Pro CH121 V5 Compute Node
Maintenance and Service Guide
3.5 Removing the Cover
Procedure
Step 1 Power off the compute node.
For details, see
Step 2 Remove the compute node.
For details, see
Step 3 Place the compute node on the ESD workstation.
Step 4 Remove the cover.
1.
2.
Figure 3-10 Removing the cover
----End
3.6 Installing the Cover
Procedure
Step 1 Place the compute node on the ESD workstation.
Step 2 Take the spare part out of its ESD bag.
Step 3 Install the cover.
Issue 06 (2019-08-10)
3.1 Power-Off
3.3 Removing a CH121
Press the button on the cover and push the cover backwards as far as it will go. See (1)
and (2) in
Figure
3-10.
Lift the chassis cover. See (3) in
Copyright © Huawei Technologies Co., Ltd.
Procedure.
V5.
Figure
3-10.
3 Basic Operations
17