Huawei FusionServer Pro CH121 V5 V100R005 Maintenance And Service Manual page 23

Compute node
Hide thumbs Also See for FusionServer Pro CH121 V5 V100R005:
Table of Contents

Advertisement

FusionServer Pro CH121 V5 Compute Node
Maintenance and Service Guide
Figure 3-7 Removing a filler panel
3.
Step 3 Install the compute node.
To prevent device damage or personal injury, hold the bottom of the device with both hands
when installing it.
1.
Issue 06 (2019-08-10)
Place the removed filler panel in an accessory recycle bin.
Install a partition board.
NOTE
Install a partition board between two half-width compute nodes. Perform this operation only when
no partition board is installed between two half-width compute nodes.
a.
Tilt the partition board to the chassis, insert it into the installation holes, and make it
upright. See (1) and (2) in
b.
Pull the partition board outwards. See (3) and (4) in
The partition board is properly installed when you hear a click.
Copyright © Huawei Technologies Co., Ltd.
Figure
3-8.
3 Basic Operations
Figure
3-8.
15

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents