FusionServer Pro CH121 V5 Compute Node
Maintenance and Service Guide
For details, see
Controller
Step 8 Remove the Avago SAS3004iMR RAID controller card.
For details, see
Step 9 Place the removed component in an ESD bag.
----End
4.3.6 Installing the Avago SAS3004iMR PCIe RAID Control Card
Procedure
Step 1 Power off the compute node.
For details, see
Step 2 Remove the compute node.
For details, see
Step 3 Place the compute node on the ESD workstation.
Step 4 Remove the cover.
For details, see
Step 5 Remove the air duct.
For details, see
Step 6 Take the spare part out of its ESD bag.
Step 7 Determine the position of the Avago SAS3004iMR RAID controller card.
Step 8 Install the Avago SAS3004iMR RAID controller card.
For details, see
Step 9 Install the M.2 FRU on the Avago SAS3004iMR RAID controller card.
For details, see
Controller
Step 10 Install the air duct.
For details, see
Step 11 Install the cover.
For details, see
Step 12 Install the compute node.
For details, see
Step 13 Power on the compute node.
For details, see
----End
Issue 06 (2019-08-10)
4.3.7 Removing the M.2 FRU from the Avago SAS3004iMR RAID
Card.
3.11 Removing a PCIe
3.1 Power-Off
Procedure.
3.3 Removing a CH121
3.5 Removing the
Cover.
3.7 Removing the Air
3.12 Installing a PCIe
4.3.8 Installing an M.2 FRU on the Avago SAS3004iMR PCIe RAID
Card.
3.8 Installing the Air
3.6 Installing the
Cover.
3.4 Installing a CH121
3.2 Power-On
Procedure.
Copyright © Huawei Technologies Co., Ltd.
Card.
V5.
Ducts.
Card.
Duct.
V5.
4 Parts Replacement
61