Huawei FusionServer Pro CH121 V5 V100R005 Maintenance And Service Manual page 4

Compute node
Hide thumbs Also See for FusionServer Pro CH121 V5 V100R005:
Table of Contents

Advertisement

FusionServer Pro CH121 V5 Compute Node
Maintenance and Service Guide
Change History
Issue
06
05
04
03
02
01
Issue 06 (2019-08-10)
Date
2019-08-10
2018-12-04
2018-10-22
2018-05-14
2017-12-28
2017-10-12
Copyright © Huawei Technologies Co., Ltd.
Description
l Added the support for the Cascade Lake
processors.
l Modified the procedures for removing and
installing a PCIe card.
l Modified the procedures for removing and
installing the compute node.
l Updated technical specifications.
l Added the procedures for removing and installing
an M.2 FRU.
l Added the procedures for removing and installing
a supercapacitor.
l Added the procedures for removing and installing
an NVMe drive.
l Added the procedures for removing and installing
a battery.
l Added information about the Avago SAS3408 and
Avago SAS3004 iMR RAID controller cards.
l Updated the memory module installation
guidelines.
l This issue is the first official release.
About This Document
iii

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents