Huawei FusionServer Pro CH121 V5 V100R005 Maintenance And Service Manual page 28

Compute node
Hide thumbs Also See for FusionServer Pro CH121 V5 V100R005:
Table of Contents

Advertisement

FusionServer Pro CH121 V5 Compute Node
Maintenance and Service Guide
A transformed air duct cannot be used in compute nodes without PCIe cards any more. Please
exercise caution.
Split the left air duct along the dotted line.
Figure 3-13 Transforming the air duct
Step 9 Align the right air duct with the right DIMMs, align the left air duct with the left DIMMs and
heat sinks, and vertically place the air ducts downwards.
Figure 3-14 Installing the air duct
Issue 06 (2019-08-10)
Copyright © Huawei Technologies Co., Ltd.
3 Basic Operations
20

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents