Huawei FusionServer Pro CH121 V5 V100R005 Maintenance And Service Manual page 89

Compute node
Hide thumbs Also See for FusionServer Pro CH121 V5 V100R005:
Table of Contents

Advertisement

FusionServer Pro CH121 V5 Compute Node
Maintenance and Service Guide
2.
Step 12 Install the processor carrier to the heat sink.
1.
Issue 06 (2019-08-10)
Figure 4-31 Pasting patterns
Use a clean card or blade to smear the thermal compound over the entire center of the
CPU.
The thickness of the thermal compound is about that of a piece of ordinary paper. Ensure
that the thermal compound is evenly and fully coated.
Figure 4-32 Smeared thermal compound layer
Aligning the processor corner with a triangle mark with the corner of the heat sink with a
notched triangle, buckle the processor carrier on the heat sink.
Copyright © Huawei Technologies Co., Ltd.
4 Parts Replacement
81

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents