Huawei FusionServer Pro CH121 V5 V100R005 Maintenance And Service Manual page 110

Compute node
Hide thumbs Also See for FusionServer Pro CH121 V5 V100R005:
Table of Contents

Advertisement

FusionServer Pro CH121 V5 Compute Node
Maintenance and Service Guide
Figure 4-60 Mainboard and compute node case
Step 9 Remove drives or M.2 modules.
l
l
l
Step 10 If PCIe cards are configured, remove them.
For details, see
Step 11 Remove the supercapacitor if there is any.
For details, see
Step 12 Remove the screw-in RAID controller card.
For details, see
Step 13 Remove the TPM.
For details, see
Step 14 Remove the USB flash drive.
For details, see
Step 15 Remove the air duct.
For details, see
Issue 06 (2019-08-10)
NOTE
The mainboard and the compute node case are assembled together and replaced as a whole package.
Remove SAS/SATA drives.
For details, see
3.13 Removing a SAS/SATA
Remove M.2 modules.
For details, see
4.3.1 Removing an M.2
Remove NVMe drives.
For details, see
3.15 Removing an NVMe
3.11 Removing a PCIe
4.3.9 Removing the
4.3.3 Removing the Screw-in RAID Controller
4.3.17 Removing the
4.3.19 Removing a USB Flash
3.7 Removing the Air
Copyright © Huawei Technologies Co., Ltd.
Drive.
FRU.
Drive.
Card.
Supercapacitor.
TPM.
Drive.
Ducts.
4 Parts Replacement
Card.
102

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents