Huawei FusionServer Pro CH121 V5 V100R005 Maintenance And Service Manual page 24

Compute node
Hide thumbs Also See for FusionServer Pro CH121 V5 V100R005:
Table of Contents

Advertisement

FusionServer Pro CH121 V5 Compute Node
Maintenance and Service Guide
2.
3.
4.
5.
Figure 3-9 Installing a compute node
Step 4 Power on the compute node.
For details, see
Step 5 Check indicator status.
For details, see
----End
Issue 06 (2019-08-10)
Figure 3-8 Installing a partition board
Press the ejector release button on the compute node. See (1) in
Fully open the ejector lever. See (2) in
Slide the compute node into the chassis horizontally. See (3) in
Close the ejector lever. See (4) in
3.2 Power-On
10.1.2 Indicators and
Copyright © Huawei Technologies Co., Ltd.
Figure
3-9.
Figure
3-9.
Procedure.
Buttons.
3 Basic Operations
Figure
3-9.
Figure
3-9.
16