Power Up The Svi Ff - GE Baker Hughes Masoneilan SVI FF Installation And Operation Manual

Digital positioner
Table of Contents

Advertisement

Power Up the SVI FF

WARNING
CAUTION
NOTE
Before powering up the SVI FF:
1. Verify that the pneumatic connections and electronic cover screws are tightened. This is
important to maintain the ingress protection level and the integrity of the flameproof
enclosure.
2. If the installation is Intrinsically Safe, check that the proper barriers are installed and the
field wiring meets local and national codes for an IS installation.
3. If the installation is non-incendive, then check that all the electrical connections are to
approved devices and wiring meets local and national codes.
4. Verify that the markings on the label are consistent with the application.
NOTE
5. Proceed to perform a Calibration and Configuration.
NOTE
78 |
BHGE
This process can cause the valve to move. Before proceeding be
sure the valve is isolated from the process. Keep hands clear from
moving parts.
Always power the SVI FF from a fieldbus power supply that
supplies 9 to 32 VDC.
When an SVI FF is turned on, apply the air supply before applying
the electrical input signal.
For Hazardous Location Installation information refer to
"Specifications and References" on page 95.
If the SVI FF is specified without local pushbuttons and display,
local operation is not available. Configure and calibrate with
ValVue or using the DD a handheld Communicator.
© 2019 Baker Hughes, a GE company, LLC. All rights reserved.

Advertisement

Table of Contents
loading

Table of Contents