Installation Steps - GE Baker Hughes Masoneilan SVI FF Installation And Operation Manual

Digital positioner
Table of Contents

Advertisement

Installation Steps

If you experience problems that are not documented in this guide call the factory or your local
representative. Sales offices are listed on the last page of this document.
WARNING
CAUTION
The steps necessary to complete the SVI FF installation and software setup are outlined in
Table 2.
Step No.
1
Attach mounting bracket to the actuator.
2
Install the SVI FF magnetic assembly (rotary valves only).
3
Assemble the SVI FF on the bracket that is mounted to
the valve actuator.
4
Install the Remote Position Sensor, if necessary.
5
Connect the pneumatic tubing to the SVI FF.
6
Connect the air supply to the SVI FF.
7
Connect the positioner to the FF Control Loop segment
by installing the SVI FF wiring.
8
Configure/Calibrate using LCD Pushbutton display
Configure/Calibrate using a Hand Held Communicator.
Configure/Calibrate using ValVue
46 |
BHGE
Failure to adhere to the requirements listed in this manual can
cause loss of life and property.
Before installing, using, or carrying out any maintenance tasks
associated with this instrument, READ THE INSTRUCTIONS
CAREFULLY.
Refer to "Output Switch" on page 25 for guidelines on safely
wiring switch load limits.
Table 2 SVI FF Installation Steps
Procedure
See page 50 for rotary valve and page 55
for reciprocating valve instructions.
See page 54 for instructions.
See page 50 for rotary valve and page 55
for reciprocating valve instructions.
See GEA31195 Masoneilan Valve Solutions
Remote Sensor Quick Start for
instructions. Also see SVI FF DTM help for
software configuration.
See page 62 for instructions.
See page 62 for instructions.
See page 66 for instructions.
See page 128 for instructions
See page 131 for instructions
See page 133 for instructions.
© 2019 Baker Hughes, a GE company, LLC. All rights reserved.
Reference

Advertisement

Table of Contents
loading

Table of Contents