GE Baker Hughes Masoneilan SVI FF Installation And Operation Manual page 60

Digital positioner
Table of Contents

Advertisement

4. Mount take-off bracket to stem block at angle which keeps turnbuckle assembly parallel
to stem (Figure 29) using:
a. For top: two plain 5/16 flat washers, helical spring washer 5/16, two hex nuts 5/16-18
regular.
b. For bottom: hex nut regular 1/4-20 and hex screw 1/4-20 UNC x 22.2 [.88] LG.
2.00" to 2.50" stroke
.50" to 1.50" stroke
Bracket configuration
Strokes .50" to 2.50"
Figure 29 Bracket Configuration Strokes .5 - 2.50" and 3-6"
5. Ensure the turnbuckle assembly is parallel to the stem and the magnets are in the valve
closed position (Figure 30) and connect to take-off bracket.
Position of magnets with
valve closed
60 |
BHGE
Figure 30 Magnet Position with Valve Closed
3.00" to 6.00" stroke
Bracket configuration
Strokes 3.00" to 6.00"
© 2019 Baker Hughes, a GE company, LLC. All rights reserved.

Advertisement

Table of Contents
loading

Table of Contents