5. Check Out and Power Up
Overview
This section provides the checkout procedures required to determine if the SVI FF is in working
order and to power up the unit.
NOTE
Check Out Procedures
SVI FF checkout consists of physical and operational checkout procedures.
Physical Inspection
The physical checkout procedures include:
"Inspect Actuator, Linkages, or Rotary Adapter" on page 74
"Verify Mounting and Linkage Adjustment" on page 74
"Check the Magnet" on page 74
"Check the Electronic Module Connections" on page 77
Valve Mounting
Air Supply
© 2019 Baker Hughes, a GE company, LLC. All rights reserved.
Perform all procedures in this section before putting the SVI FF
into operation.
Masoneilan SVI FF Instruction Manual
| 73
=