Overview; Check Out Procedures; Actuator, Linkages, Or Rotary Adapter; Configuration And Calibration - GE SVI II AP-2 Quick Start Manual

Svi ii ap digital positioner
Table of Contents

Advertisement

Check Out,
Configuration and
Calibration

Overview

This section provides the calibration procedures to ensure proper valve
positioning. Operational checkout, configuration and calibration procedures are
described using an SVI II AP that has a display with pushbuttons.

Check Out Procedures

SVI II AP checkout consists of physical and operational checkout procedures. The
physical checkout procedures include:
NOTE
"Inspecting Actuator, Linkages, or Rotary Adapter" on page 46
"Verifying Mounting and Linkage Adjustment" on page 46
"Checking the Magnet" on page 46
"Checking the Air Supply" on page 48
"Checking the Electronic Module Connections" on page 48
Perform all procedures in this section before
putting the SVI II AP into operation.
45
3

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Svi ii ap-3

Table of Contents