9 Operation at Use of the Display

9.2 Starting Operation

9.2
Starting Operation
Before starting the device, the following preconditions must be satisfied:
Mount the SICAM Q100 as described in Chapter 6.2.
Connect the lines for measurement, communication and supply voltage as described in Chapter 6.3 and
observe the safety provisions.
Switch on the devices needed for the measurement.
Switch on the supply voltage of the SICAM Q100.
Check whether the LEDs at the SICAM Q100 signal that the device is ready (see Chapter 12.3).
The following picture is displayed while the device is being initialized after switching on the supply voltage:
Figure 9-1
Once the device has initialized, the currently selected screen with measured values is displayed.
NOTE
The following pictures only show the display without the front view of the device.
280
Start Screen
SICAM Q100, 7KG95xx, Device Manual