Replacing A Controller Node-Two-Node System Only-Sp 5.X - HPE 3PAR StoreServ 7000 Storage Service And Upgrade Manual

Customer edition
Hide thumbs Also See for 3PAR StoreServ 7000 Storage:
Table of Contents

Advertisement

Push the gray Controller Node Rod into the replacement Controller Node.
If the UID LED is flashing blue after two minutes, this LED status indicates that the replacement
Controller Node is not properly seated, so repeat this step.
Once inserted, the replacement Controller Node powers up and goes through the automatic Node-to-
Node rescue before joining the cluster. This process might take up to 10 minutes.
IMPORTANT:
If the automatic Node-to-Node Rescue does not start automatically, contact your authorized
service provider.
Verification:
16. Verify that the Controller Node has joined the cluster.
Confirm that the green Status LED on the Controller Node is flashing in synchronization with the
other Controller Nodes, indicating that it has joined the cluster.
17. From the HPE 3PAR SPOCC interface, verify that the State for the component and the storage
system are Normal (green).
18. After the component replacement, initiate Check Health of the storage system.
a. From the HPE 3PAR SPOCC interface main menu, click Support in the left navigation pane.
b. From the Service Processor - Support page, under StoreServs, click Health Check in the
Action column.
19. If significant time is left in the maintenance window, end the Maintenance Mode.
a. From the HPE 3PAR SPOCC interface main menu, select SPMAINT in the left navigation pane.
b. From the HPE 3PAR SPMAINT interface main menu under Service Processor - SP
Maintenance, select StoreServ Configuration Management.
c. Under Service Processor - StoreServ Configuration, select Modify under Action.
d. Under Service Processor - StoreServ Info, select Off for the Maintenance Mode setting.
20. Follow the return instructions provided with the replacement component.
Replacing a Controller Node—Two-node system only—SP 5.x
This procedure is for the replacement of an HPE 3PAR StoreServ 7000 Storage Controller Node using
HPE 3PAR Service Processor (SP) 5.x.
Procedure
Preparation:
1.
Unpack the component and place on an ESD safe mat.
2.
Connect to the HPE 3PAR Service Processor (SP)
Browse to the IP address:
https://<sp_ip_address>:8443
Replacing a Controller Node—Two-node system only—SP 5.x
11

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents