Configuring the Smart Link Cable project

Configuring the project

Once the OTDR module is set into the T-BERD/MTS, and the Smart Link
Cable license installed:
1
From the Home page, select the Expert OTDR function.
The results page automatically displays.
If not, press R
2
Press S
ETUP
Configure the OTDR Acquisition parameters (see
Configure the OTDR Alarms parameters (see
Configure the OTDR File parameters (see
3
Press Link Cable menu key
4
Configure the Link Description parameters (see
5
In the new window Cable Project, configure the project as required:
Use the Edition keypad to enter a name for Contactor Id / Sub Contractor Id /
Engineer Id.
On the parameter Start Fiber, press Edit Number soft key to enter the number
of the first fiber of the cable to be tested (Min 1 / Max 100)
On the parameter Number Of Fibers, press Edit Number soft key to enter the
total number of fibers of the cable (Min 1 / Max 100)
OR
Press Load Project soft key to load an existing project (see
an existing project" on page
hard key to display results page.
ESULTS
hard key to display the OTDR configuration screen and:
User Manual
Chapter 3 Reflectometry measurements
page
page
55)
.
167).
78000010220 Rev. 023
Smart Link Cable Option
page
35)
40)
page
48)
"Loading
165