Chapter 6 Bi-directional OTDR
Performing a bi-directional measurement
Fiber link check
To ensure that the two units are connected to the same fiber under test,
select
Check same
symbol will be displayed on the measurement status zone.
Measurement process
Fiber measurement
Step 1
1
Choose to use the markers stored in memory or not by selecting
Lock Evt
NOTE
If the markers events are already defined for the link, you may
select the
form measurements with those markers. Otherwise select
Evts.
2
Press S
The line Check if same set up on both units becomes In progress... .
NOTE
A warning may occur if the configurations of the two units are dif-
ferent (see
tions" on page
The begin launch cable is transferred to the end launch cable, and the end
launch cable is transferred to the begin launch cable. The master Platform
216
fiber. If the fiber is the same at both extremities, a
or
Free
Evts.
Lock Evt
key. This implies that the unit will now per-
to begin the measurement.
TART
"Warning/errors resulting from common configura-
230).
User Manual
78000010220 Rev. 023
Free