Sending A Message To The Distant Platform - Viavi 8100 V2 Series User Manual

Scalable multitest platform
Hide thumbs Also See for 8100 V2 Series:
Table of Contents

Advertisement

Automatic pairing / continuity check
As soon as the secondary (B) unit is connected to the fiber, the primary (A)
unit detects it (and vice-versa).
Both unit are connected to the same fiber

Sending a message to the distant Platform

Once both Platforms are paired via the fiber to be tested, each one can
send a message to the other Platform.
This message can be sent to launch a test, to wait before launching the
test, to clean the connectors...
To send a message to the distant Product Name/Family Brand:
1
Go to the Results page.
2
Press Send a message softkey.
A new screen displays.
Figure 125 List of messages available
User Manual
Chapter 7 FiberComplete Modules
One unit is disconnected of the fiber link, or
there is a break
78000010220 Rev. 023
Performing the tests
251

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Mts 8000T-berd 8000T-berd 6000a v2Mts 6000a v2

Table of Contents