Keysight Technologies N9030B Service Manual page 461

Pxa signal analyzer
Table of Contents

Advertisement

Assembly Replacement Procedures
RF Area (Options 503, 508, 513, 526)
2. Refer to
Figure 16-29
Switch 2 Placement
3. Secure the bracket to the Low Band Switch bracket with the single screw
4. Align switches so they are parallel with side of instrument then torque the
N9030B PXA Signal Analyzer Service Guide
Figure
16-29. Place the second switch/bracket assembly (1)/(2)
on the bracket previously installed. Assure label on switch is facing up. To
attach use the two screws (3) (0515-1992).
(4) (0515-0372). Do not torque.
four screws (3) securing the switches to the brackets to 6 in lbs. Torque
the screw (4) that secures the switch brackets together to 9 inch-lbs.
461

Advertisement

Table of Contents

Troubleshooting

loading

Table of Contents