Assembly Replacement Procedures
Top Brace and Power Supply Bracket
Figure 16-5
Wire Hold Downs
Replacement
1. Refer to
N9030B PXA Signal Analyzer Service Guide
Figure
16-4. To replace the top brace or the power supply
bracket, place them into the correct position and attach the screws
referred to in the removal process. Reinstall wire hold down 1. Torque to
9 inch-pounds.
437