Subject: 7BPUE15 Mast Cables
INSTALLATION:
1. Mount the new pulley (Item 3) next to the original pulley.
2. Run one cable over the new pulley and the other cable over the original pulley.
3. Make sure that the cables run parallel to each other and do not cross.
4. Reference figure 1 below for correct pulley mounting.
5. Use the springs (Item 5) to hold down the cables.
6. Use straps (Item 6) to secure the cables where necessary.
Figure 1
Page 2 of 2