Mitsubishi Electric MELSEC iQ-R-RD75P4 User Manual page 340

Melsec iq-r series positioning module (application)
Table of Contents

Advertisement

■OPR control
1.
Select a target axis to be tested from the pull-down menu of "Target Axis".
2.
Select "JOG/Manual Pulse Generator/OPR" from the pull-down menu of "Select Function".
3.
Select "Machine OPR" or "Fast OPR" from the pull-down menu of "OPR Method".
4.
Click the [OPR] button.
The on state of Near-point dog signal, Zero signal, and OPR complete flag can be checked on the monitor
part. Check the OPR completion on the monitor.
10 MONITORING/TEST
338
10.2 Positioning Test

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents