Mitsubishi Electric MELSEC iQ-R-RD75P4 User Manual page 137

Melsec iq-r series positioning module (application)
Table of Contents

Advertisement

Operation timing and the processing time
Positioning start signal
[Y10, Y11, Y12, Y13]
BUSY signal
[XC, XD, XE, XF]
M code ON signal
[X4, X5, X6, X7] (WITH mode)
Cd.7
M code ON signal
OFF request
Start complete signal
[X10, X11, X12, X13]
Md.26
Axis operation status
Pulse output to an external source
(PULSE)
Positioning operation
External speed-position
switching command
Positioning complete signal
[X14, X15, X16, X17]
M code ON signal
[X4, X5, X6, X7] (AFTER mode)
Cd.7
M code ON signal
OFF request
OPR complete flag
Md.31
Status: b4
Normal timing time
t1
t2
0.2 to 0.3ms
0 to 0.88ms
*1 The timing time of t5 described is the time when 0 is set for the dwell time.
t1
t2
Standby
Speed control
Position control
t4
Speed
Position
control
control
*
t6
t3
t4
0 to 0.88ms
0.1ms or less
t3
Standby
Speed control is carried out until Speed-position switching signal
is turned on.
t5
t7
t2
*1
t5
t6
0 to 0.88ms
1.0 ms
3 MAJOR POSITIONING CONTROL
t7
Depends on the parameter
135
3.2 Positioning Data Setting
3

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents